Bump Testing a Gas Tracer 92
If the bump test fails and the Force Calibration box was not selected, the
following window will open indicating which channels failed the bump test.
The BUMP T LED on the SDM-2012 control panel will be solid red. Click
OK to return to the main program window or double click the instrument
information line to view the bump test results in the Logs window. The
BUMP T LED on the SDM-2012 control panel will turn off.