Calibrating a GX-2012 74
14. After the fresh air purge is complete,
If the calibration passes, the following window will open indicating that. The
CAL S LED on the SDM-2012 control panel will be solid green. Click OK to
return to the main program window. The CAL S LED will turn off.
Figure 56: Calibration Passed
The GX-2012 will automatically be shut off 20 seconds after a successful
calibration.