Rki-instruments SDM-2012 PC Controlled Configuration Manuel d'utilisateur Page 92

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 218
  • Table des matières
  • DEPANNAGE
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 91
87 • Bump Testing a Gas Tracer
17. After calibration gas has been applied to the ppm sensor, fresh air will be
applied to the standard 3 sensors (catalytic LEL, O
2
, and CO) and the
%volume sensor (if installed) for 45 seconds and the PC Controller program
will perform a zero adjustment.
Figure 67: Air Flowing to Standard 3 Sensors
The PC Controller Program will analyze the zero adjustment results. If any of
the standard 3 sensors or %volume sensor (if installed) failed the zero
adjustment, the bump test will be aborted.
Vue de la page 91
1 2 ... 87 88 89 90 91 92 93 94 95 96 97 ... 217 218

Commentaires sur ces manuels

Pas de commentaire