Rki-instruments SDM-2012 PC Controlled Configuration Manuel d'utilisateur Page 67

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 218
  • Table des matières
  • DEPANNAGE
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 66
Bump Testing a GX-2012 62
If the bump test fails and the Force Calibration box was not selected, the
following window will open indicating which channels failed the bump test.
The BUMP T LED on the SDM-2012 control panel will be solid red. Click
OK to return to the main program window or double click the instrument
information line to view the bump test results in the Logs window. The
BUMP T LED on the SDM-2012 control panel will turn off.
Figure 45: Bump Test Failed
Vue de la page 66
1 2 ... 62 63 64 65 66 67 68 69 70 71 72 ... 217 218

Commentaires sur ces manuels

Pas de commentaire