Rki-instruments SDM-2009 PC Controlled Configuration Manuel d'utilisateur Page 42

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 114
  • Table des matières
  • DEPANNAGE
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 41
37 • Connecting Instruments to the PC Controller Program
3. Install a GX-2009 in the instrument cradle.
NOTE: If the GX-2009 is left in the SDM-2009 after bump testing or calibration,
the pump will run for 12 seconds every 2 minutes in order to keep
hydrogen generated from charging of the NiMH batteries from affecting
the CO sensor.
4. Turn on each SDM-2009 by pressing and holding the SDM-2009’s POWER
button. When the control panel LEDs turn on, release the POWER button.
5. The BUMP T and CAL S LEDs will turn off and the COPY LED will be
steadily on or off. It will be on if the SDM-2009 was used in Standalone
Configuration and calibration and bump test records are still stored in the
SDM-2009’s memory (see the SDM-2009 Docking Station Standalone
Configuration Manual for more information). The CHARGE LED will be
blinking green if the SDM-2009 is operating properly or solid red if there is a
system failure.
6. When a connection has been established between the SDM-GX Docking
Station PC Controller Program and all of the SDM-2009s, the main program
window will appear as shown below.
Figure 26: SDM-2009 Connection
7. Press and hold the POWER MODE button on the instrument until you hear a
beep, then release it. The instrument will begin its power up sequence (see
Vue de la page 41
1 2 ... 37 38 39 40 41 42 43 44 45 46 47 ... 113 114

Commentaires sur ces manuels

Pas de commentaire