Rki-instruments GX-2012 Manual Manuel d'utilisateur Page 184

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 185
  • Table des matières
  • DEPANNAGE
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 183
176 Bump Testing GX-2012 Operator’s Manual
calibration initiated because of a failed bump test is the difference
between the bump test gas time and the calibration time defined in the
BUMP--SET menu item in Maintenance Mode.
At the end of the calibration, the instrument displays the results from
both the bump test and the calibration. Use the AIRS or (SHIFT)T
buttons to scroll between the calibration/bump test results, the bump
test gas readings, and the calibration gas readings.
To return to the BUMP screen in Calibration Mode, press POWER
1
20.9
37
10.0
%LEL
%
ppm
ppm
MAINTENANCE
CH4
O2
CAL 60
CO
H2S
FP
PP
FF
PP
%LEL
%
ppm
ppm
MAINTENANCE
CH4
O2
BUMP/CAL
CO
H2S
1
12.0
5
23.0
%LEL
%
ppm
ppm
MAINTENANCE
CH4
O2
BUMP/
CO
H2S
49
12.0
5
25.0
%LEL
%
ppm
ppm
MAINTENANCE
CH4
O2
/CAL
CO
H2S
Vue de la page 183
1 2 ... 179 180 181 182 183 184 185

Commentaires sur ces manuels

Pas de commentaire